Pharmaceutical

Gmech Group

Stainless steelPiping

2025

Year

Gmech Group

Gmech Group partnered with MIDEX to upgrade the stainless-steel process piping serving its pharmaceutical manufacturing operations at the Cira Pharma facility in 6th of October City.

The challenge

The Cira Pharma facility needed a hygienic, corrosion-resistant piping network capable of meeting pharmaceutical-grade process requirements, with minimal disruption to ongoing production.

Our approach

MIDEX's engineering team surveyed the existing utilities, designed the stainless-steel routing to GMP hygienic-piping standards, and carried out orbital welding, pressure testing and passivation on site.

Project scope

SS Piping Network. Location: 6th of October City (Cira Pharma facility). Year of implementation: 2025.

Key deliverables

  • Detailed piping isometrics and layout drawings
  • stainless-steel fabrication and orbital welding
  • pressure and leak testing
  • passivation and documentation package for QA sign-off

Outcome

A validated, GMP-compliant stainless-steel piping network was commissioned on schedule, giving Gmech Group a reliable process utility backbone at Cira Pharma.