ECAP engaged MIDEX to modify and upgrade the Reverse Osmosis (RO) water station at its ECAP facility in Giza.
The challenge
The existing RO water station needed process and capacity modifications to keep pace with production demand while maintaining pharmaceutical water-quality standards.
Our approach
MIDEX assessed the RO skid and distribution loop, engineered the required modifications, and executed the upgrade with minimal downtime to the water system.
Project scope
RO Water Station Modifications. Location: Giza. Year of implementation: 2024.
Key deliverables
- RO system assessment and modification design
- membrane and skid modification works
- piping and instrumentation updates
- commissioning and performance verification
Outcome
The upgraded RO water station now delivers consistent, specification-compliant purified water output to support ECAP's ongoing production at the site.


