Cons Korra worked with MIDEX to install a clean gases network at its MEVAC3 facility in Al-salheia City.

The challenge

The site required a clean gases distribution network built to pharmaceutical hygienic and safety standards.

Our approach

MIDEX engineered the clean gases routing, selected appropriate materials and fittings, and installed and tested the network to specification.

Project scope

Clean Gases Network. Location: Al-salheia City (MEVAC3 facility). Year of implementation: 2025.

Key deliverables

  • Clean gases network design
  • piping fabrication and installation
  • leak and pressure testing
  • as-built documentation

Outcome

The completed clean gases network gives Cons Korra a safe, specification-compliant gas supply at MEVAC3.