Pharmaceutical

Reda Chem

Sanitary drain

2025

Year

Reda Chem

Reda Chem partnered with MIDEX on the sanitary drain works at its Reda Chem facility in 10th of Ramadan City.

The challenge

The facility needed a compliant sanitary drainage system able to safely evacuate process effluent.

Our approach

MIDEX designed and installed the sanitary drain network, incorporating the required slopes, materials and connections for hygienic and regulatory compliance.

Project scope

Sanitary Drain. Location: 10th of Ramadan City. Year of implementation: 2025.

Key deliverables

  • Sanitary drain design
  • installation of drainage piping and fittings
  • testing
  • as-built handover documentation

Outcome

Reda Chem now has a compliant sanitary drainage system in place at the site.