Food & Beverage

Hassan Allam

Stainless steelDistribution loop

2024

Year

Hassan Allam

Hassan Allam engaged MIDEX to install purified and soft water stainless-steel loop networks at its Mars Wrigley facility in 6th of October City.

The challenge

The site required parallel purified water and soft water distribution loops built to hygienic stainless-steel standards.

Our approach

MIDEX designed and installed the two SS loop networks, applying orbital welding and slope-controlled routing to maintain water quality throughout distribution.

Project scope

Purified and soft water SS loop networks. Location: 6th of October City (Mars Wrigley facility). Year of implementation: 2024.

Key deliverables

  • Loop network design (purified and soft water)
  • stainless-steel fabrication and orbital welding
  • pressure testing and passivation
  • documentation package

Outcome

Hassan Allam now operates dual purified and soft water loop networks that reliably serve Mars Wrigley.