Pharmaceutical

Delta Care

Purified waterModificationsDistribution loop

2025

Year

Delta Care

Delta Care partnered with MIDEX to deliver a Purified Water (PW) loop at its Delta Care facility in 10th of Ramadan City.

The challenge

The facility needed a hygienic, continuously circulating purified water distribution loop meeting pharmacopoeial water-quality standards.

Our approach

MIDEX designed the PW loop, fabricated and installed the stainless-steel piping with orbital welding, and validated the loop's flow and quality performance.

Project scope

Purified water loop Modification. Location: 10th of Ramadan City. Year of implementation: 2025.

Key deliverables

  • PW loop design and routing
  • stainless-steel fabrication and orbital welding
  • passivation
  • commissioning and performance verification

Outcome

The purified water loop now supplies Delta Care's production areas at Delta Care reliably and to specification.