Cons Korra partnered with MIDEX to deliver a Purified Water (PW) loop at its MEVAC5 facility in Al-salheia City.

The challenge

The facility needed a hygienic, continuously circulating purified water distribution loop meeting pharmacopoeial water-quality standards.

Our approach

MIDEX designed the PW loop, fabricated and installed the stainless-steel piping with orbital welding, and validated the loop's flow and quality performance.

Project scope

Purified water loop. Location: Al-salheia City (MEVAC5 facility). Year of implementation: 2025.

Key deliverables

  • PW loop design and routing
  • stainless-steel fabrication and orbital welding
  • passivation
  • commissioning and performance verification

Outcome