Pharmaceutical

Otsuka Pharma Egypt

Purified waterDistribution loop

2026

Year

Otsuka Pharma Egypt

Otsuka Pharma Egypt partnered with MIDEX to deliver a Purified Water (PW) loop at its Otsuka Pharma Egypt facility in 10th of Ramadan City.

The challenge

The facility needed a hygienic, continuously circulating purified water distribution loop meeting pharmacopoeial water-quality standards.

Our approach

MIDEX designed the PW loop, fabricated and installed the stainless-steel piping with orbital welding, and validated the loop's flow and quality performance.

Project scope

Purified water loop. Location: 10th of Ramadan City. Year of implementation: 2026.

Key deliverables

  • PW loop design and routing
  • stainless-steel fabrication and orbital welding
  • passivation
  • commissioning and performance verification

Outcome

The purified water loop now supplies Otsuka Pharma Egypt's production areas at Otsuka Pharma Egypt reliably and to specification.