Otsuka Pharma Egypt partnered with MIDEX to deliver a Purified Water (PW) loop at its Otsuka Pharma Egypt facility in 10th of Ramadan City.
The challenge
The facility needed a hygienic, continuously circulating purified water distribution loop meeting pharmacopoeial water-quality standards.
Our approach
MIDEX designed the PW loop, fabricated and installed the stainless-steel piping with orbital welding, and validated the loop's flow and quality performance.
Project scope
Purified water loop. Location: 10th of Ramadan City. Year of implementation: 2026.
Key deliverables
- PW loop design and routing
- stainless-steel fabrication and orbital welding
- passivation
- commissioning and performance verification
Outcome
The purified water loop now supplies Otsuka Pharma Egypt's production areas at Otsuka Pharma Egypt reliably and to specification.


