ARABCOMED engaged MIDEX to install a stainless-steel homogenizer line at its ARABCOMED facility in Al-Obour City.
The challenge
The production process required a hygienic stainless-steel line connecting the homogenizer to the surrounding process equipment.
Our approach
MIDEX designed and installed the SS line, integrating it with the homogenizer and adjoining process equipment to hygienic piping standards.
Project scope
Homogenizer SS Line Installation. Location: Al-Obour City. Year of implementation: 2024.
Key deliverables
- SS line design and routing
- fabrication and installation
- integration with homogenizer
- testing and handover
Outcome
ARABCOMED's homogenizer line is now fully integrated and operational.