Rota Biogen engaged MIDEX to carry out roughness testing on its process piping at its facility in 10th of Ramadan City.
The challenge
The site needed to verify the internal surface finish of its process piping against hygienic design requirements.
Our approach
MIDEX performed on-site roughness testing of the piping surfaces and reported the results against the applicable acceptance criteria.
Project scope
Roughness Test. Location: 10th of Ramadan City. Year of implementation: 2025.
Key deliverables
- On-site roughness testing
- measurement records
- compliance reporting
Outcome
Rota Biogen received verified surface-finish data confirming the hygienic quality of its piping at the site.


