SPIMACO sourced and had installed a replacement membrane for its water station at its facility in Borg Al Arab City through MIDEX.
The challenge
The water station's RO membrane needed replacement to restore rejection performance and output quality.
Our approach
MIDEX supplied the correctly specified membrane and carried out the installation, verifying performance before handover.
Project scope
Supply and installation Membrane for the water station. Location: Borg Al Arab City. Year of implementation: 2026.
Key deliverables
- Membrane specification and supply
- installation
- performance testing
- documentation handover
Outcome
SPIMACO's water station is back to full rejection performance with the new membrane installed.